The North Hempstead town board will reconsider a one-year moratorium on large battery storage systems in October, nearly two months after a similar vote failed.
In August, the board voted 3-1 on the resolution, with two abstentions. To pass a law in North Hempstead, a majority of four votes is required. North Hempstead became the first Long Island town to reject a proposal for a battery storage site.